Key personnel from Geodetic were heavily involved with the consulting engineers responsible for the Conwy Crossing, a submerged tube tunnel project crossing the River Conwy in North Wales.

Part of the work involved the digging of vast trenches to accommodate the submerged tunnel elements but much of the job costing was based on amounts dredged and placed at other locations.  Key personnel from Geodetic developed systems to allow for the calculations to be made and checked using surveyed apex points of the dumped cargo.  This saved the engineers many hours of laborious calculations.